上海惠灵顿的地板更新

客户担心新安装的PVC地板与边线上的水槽之间有缝隙。担心学生会拉动松动的部分,最终损坏地板。我们不得不使用面板来关闭通常用于电梯的间隙。

Floor Installation at Wellington Shanghai
The customer was concerned about the gap between the newly installed PVC floor and the water channel on the side lines. The concern was that the students would pull on loose parts and eventually damage the floor. We had to use panels to close the gap that is normally used for elevators.

斯波蒂湾的任务。

安装一个新的PVC运动地板 

挑战:

  • 将带有不同排水系统的硬球场地板改为PVC运动地板。
  •  在体育场馆提供安全的排水系统
The customer was concerned about the gap between the newly installed PVC floor and the water channel on the side lines. The concern was that the students would pull on loose parts and eventually damage the floor. We had to use panels to close the gap that is normally used for elevators.

我们客户的反馈。

我们的解决方案。

为了封闭新楼层与旧水渠之间的缝隙,我们从电梯技术中衍生出一种封闭方法。

New Floor with the Aluminum Profile