The customer was concerned about the gap between the newly installed PVC floor and the water channel on the side lines. The concern was that the students would pull on loose parts and eventually damage the floor. We had to use panels to close the gap that is normally used for elevators.


The task for SportyBay:
Installing a new PVC sports floor
The challenge:
- Change of hard court floor with a different water drainage system to a PVC sports floor
- Providing a secure Drainage System in the Sports Dome

The feedback from our Customer:
Our solution:
In order to close the gap between the new floor and the old water channel, we have developed a closure method that was derived from the elevator technology.